本项目起自镇江南互通,向南经高新区,丹徒区,止于丹徒枢纽,均在镇江市境内,起止桩号:K2+330-K34+410.5,全长13.081km。全线采用沿既有高速公路“两侧拼接加宽”的改扩建方案,由双向四车道扩建为双向六车道,设计速度为120km,路基宽度34.5m。项目原位扩建镇江南互通、上党互通、丹徒枢纽共3处互通式立体交叉,新增1处谷阳服务区。路基填方为104.4万方,挖方为113.5万方:全线共设桥梁25座(主线林12座,互通匝道桥改建或新建5座,护栏提升改造5座,支线上跨桥拆除新建2座,顶升2座)。项目造价10.19亿元,工期23个月。