Preview
Description
任务分解系统是一款团队任务管理工具,帮助你高效创建、分解和跟踪任务。 主要功能: • 创建任务并分配给团队成员 • 支持任务多级分解,逐层追踪进度 • 语音录入任务,AI 自动整理并分配 • 实时查看待处理任务及完成状态 • 好友管理,方便团队协作 • 版本更新提醒
Technical Analysis
Package Overview Basic metadata
Bundle ID
com.hhtx.wbdclient Current Version 1.0.13
Minimum iOS 13.0
Package Size App Store Size
Package Metadata 0 / 1 version records
Detailed binary, privacy manifest, framework, and Info.plist results have not been indexed for this package yet. The verified App Store and archive metadata above remains available.
Developer Information
Known Version Records
0 version records with stored package metadata • 1 known version records
Stored metadata does not guarantee a package is currently available to download.
| Details | Version / IDs | Version date | Action |
|---|---|---|---|
| Not archived | App Store ID: 881549832 | Unknown | Request Version |