Description
ReScope helps contractors and remodelers create professional change orders on iPhone. Create jobs, write clear line items, lock final versions, and keep revisions organized so everyone knows what is current. ReScope is designed to be fast on-site and easy to use during real client conversations. Key features: Jobs and change orders in one clean workflow Lock + revision structure to preserve history Saved Files and Package ZIP generation for sharing Built-in checks before sharing to help catch issues Offline-first experience for field use Backup and restore support Premium, iOS-native interface Why teams choose ReScope: Faster documentation when scope changes Clear revision trails that reduce confusion Shareable files that look professional Practical workflow built for contractors, remodelers, and builders Subscription: ReScope Pro is available as auto-renewing subscriptions: Monthly: $12.99 Yearly: $129.99 Both plans include a 14-day free trial for eligible users. Trial and billing are managed by Apple through your Apple ID, and you can cancel in iPhone Settings > Apple ID > Subscriptions. Support: https://www.rescope.info/support Privacy Policy: https://www.rescope.info/privacy Terms of Service: https://www.rescope.info/terms
Technical Analysis
Package Overview Basic metadata
Bundle ID
com.tsimpson.rescope Current Version 1.0.0
Minimum iOS 26.2
Package Size App Store Size
Package Metadata 0 / 1 version records
Detailed binary, privacy manifest, framework, and Info.plist results have not been indexed for this package yet. The verified App Store and archive metadata above remains available.
Developer Information
Known Version Records
0 version records with stored package metadata • 1 known version records
Stored metadata does not guarantee a package is currently available to download.
| Details | Version / IDs | Version date | Action |
|---|---|---|---|
| Not archived | App Store ID: 881755678 | Unknown | Request Version |