Preview
Description
The project “EwepCe Effective and well-functioning EWCs in post – Covid era“ has proceeded at a very dynamic time. In the first phase of the project, we examined the evaluation of EWC performance in the participating countries. The assessment was mixed. The labour side expected better work efficiency, more information, and more meaningful consultation. It pointed to the challenges faced by EWCs in relation to the energy crisis, energy prices, and the transformation related to automation and greening. The legislative side was more satisfied with the current regulation and practice of EWCs.
What's New
Version 1.0.1 2024-03-27
New name and icon. Technical Analysis
Package Overview Basic metadata
Bundle ID
com.alextalin.startandgo Current Version 1.0.1
Minimum iOS 13.4
Package Size App Store Size
Package Metadata 0 / 2 version records
Detailed binary, privacy manifest, framework, and Info.plist results have not been indexed for this package yet. The verified App Store and archive metadata above remains available.
Known Version Records
0 version records with stored package metadata • 2 known version records
Stored metadata does not guarantee a package is currently available to download.
| Details | Version / IDs | Version date | Action |
|---|---|---|---|
| Not archived | App Store ID: 864757347 | Unknown | Request Version |
| Not archived | App Store ID: 864667891 | Unknown | Request Version |